NEWS

Under-track culvert made safe and new pipe installed by guided auger boring

18 Jan 2010

We were called in by main contractors Amco to advise on the problem. Open cut wasn’t an option as the line is in regular use meaning that a trenchless solution was essential.

Our engineers surveyed the site and recommended installing a new 225mm ID gravity sewer using guided auger boring and Naylor Denlok clayware, and then stabilising the old culvert with cementitious grout.

After installing the new sewer, a 63mm ID perforated pipe was installed at the roof height of the old culvert which was then used as a grout tube. Cementitious grout was injected into the void to stabilise the ground and fill any voids in the old culvert.

As the site was adjacent to a pig farm, we had to ensure that hygiene on the farm wasn’t compromised, so vehicle washing baths were installed at the entrance to prevent possible contamination of the herd.

More Articles...




To send us a detailed message, click here
 
 

Perco - Specialists In Trenchless Technology

©Perco Engineering Services Ltd 2007. All Rights Reserved.  |  Terms of Use  |  Privacy Policy  |  Site Credits