CASE HISTORY PDF'S

Auger boring installs Oldham sewer

Flooding affecting homes and a school in Oldham...

Download PDF...

Auger boring for Nottingham storm drain

Flooding of the railway near Nottingham...

Download PDF...

Trees protected using guided auger boring

The conversion of an old school in a conservation area...

Download PDF...

Lincolnshire pumping main installation

Pipes installed under railway in weekend possession.

Download PDF...

Drilling to freedom

Using one of its laser guided BM400 auger boring rigs, Perco installed an outfall sewer pipe for a new Bovis lend-lease development adjacent to the Law Courts in Gartside Street, Manchester.

Download PDF...

Auger boring in Blackburn

Flooding problems in the Granville Road area of Blackburn necessitated an upgrade to the local sewer network. United Utilities’ main contractor, Balfour Beatty Utilities had to install a new overflow system to reduce local flooding.

Download PDF...

Going Underground

We used our Bohrtec BM150DT guided auger boring rig to install a new cable duct under the live rail at Kew and Gunnersbury Underground Stations. The BM150DT was chosen for its ability to work from small diameter shafts and within pipes, and for its a

Download PDF...




To send us a detailed message, click here
 
 

Perco - Specialists In Trenchless Technology

©Perco Engineering Services Ltd 2007. All Rights Reserved.  |  Terms of Use  |  Privacy Policy  |  Site Credits